ASTM E1155 PDF

A commonly used standard to quantify finished quality of elevated and slabon- ground slabs is the ASTM Standard E The procedure outlines the method of . slab-on-ground slabs is the ASTM Standard, ASTM E The procedure outlines the method of profiling finished concrete to determine the flatness (FF) and. ASTM E Standard Test Method for Determining FF Floor Flatness and FL Floor Levelness Numbers.

Author: Gajas Faelmaran
Country: Eritrea
Language: English (Spanish)
Genre: Education
Published (Last): 28 March 2018
Pages: 85
PDF File Size: 12.77 Mb
ePub File Size: 13.34 Mb
ISBN: 867-7-43268-872-5
Downloads: 70527
Price: Free* [*Free Regsitration Required]
Uploader: Arashicage

A simple w orkflow from importing the files to producing a report of the surface deviation analysis. When the traffic patterns across a floor are random, as is generally the case evaluation of the floor’s F F Flatness and F L Levelness will necessarily involve a random sampling of the surface, since all of the infinite potential profiles to be seen by the traffic can not possibly be measured.

These notes and footnotes excluding those in tables and figures shall not be considered as requirements of this test method. If you would like to download the file used in this article, download the accompanying Training Data and extract its contents to a folder on your PC.

Link to Active This link will always route to the current Active version of the standard. Split cloud Creating lines representing a run.

It is the responsibility of the user of this standard to establish appropriate safety and health practices and aetm the applicability of regulatory limitations prior to use. No other units of measurement are included in this standard. When prompted specify a location and name for the PDF report.

  EL DESTINO DE UN HOMBRE MIJAIL SHOLOJOV PDF

A simple workflow from importing the files to producing a report of the surface satm analysis. Select all the sample lines. Click on the Report tab and click on Generate Report. By now you should have a grasp of the following: Generate a Report from the Analysis The asgm will automatically build a standard report. Referenced Documents purchase separately The documents listed below are referenced within the subject standard but are not provided as part of the standard.

Module Floor Flatness and Level ASTM E with BuildIT Construction – FARO┬« Knowledge Base

In those instances when the traffic across a floor will be confined to specific paths, however, the requirement for random sampling is eliminated, since the floor can indeed be inspected exactly as it will atsm seen by all of the traffic. To avoid errors, save the current project before attempting the Floor Flatness Analysis. Tutorial Download If you would like to download the file used in this article, download the accompanying Training Data and extract its contents to a folder on your PC.

Historical Version e155 – view previous versions of standard. Select a start point and then select an end point for the first line. Next we will create a line for each run, the end result will appear as shown: By now you should have a grasp of the following:. Repeat for several runs, as shown above.

  INTEL MICROPROCESSOR 8086 BARRY B BREY PDF

Create Lines for Each Run Next we will create a line for each run, the end result will appear as shown: Split cloud down to the area to be e155.

In these special cases, rather than inferring the condition of the traffic paths from a random sample, it is far more useful to measure each of the traffic paths directly using continuous recording floor profilometer configured to run exactly in the traffic wheel paths.

Line Panel for each completed line.

Module 6.2: Floor Flatness and Level ASTM E1155 with BuildIT Construction

Construct a polygon line around the area shown below. Use the defaults for this exercise. A complete metric companion to Test Method E has been developed, Test Method EM ; therefore, no metric equivalents are shown in this test method. Such direct simulation measurements eliminate the inherent uncertainties of statistical sampling and provide profile information immediately applicable to the correction of the surface in way of the future traffic.

Lines are created to represent runs with traditional equipment.